Home
Getting Started
Tail Section
Wings
Fuselage
Engine
Instruments
Finish
Credits
Getting Started

Well, the plans arrived on August 30, 2000. These look a lot more complicated than the model airplanes I used to build as a kid. But after an hour or so of study on the elevator and stabilizer, it is starting to make a little more sense. At times it is hard to find where it says what size of wood to use for a particular location. (Finally figured out, the stab and elevator ribs are 1/4" by 1/2", covered by 1.5 mm ply. The front of the elevator ribs are 1/2" square.

Yes, this is going to be a long term project. Now I need to let Kreg and Lee know the plans are here.

 

Current manhours this section - 1.5
Sept 1, 2000

[Home] [Getting Started] [Tail Section] [Wings] [Fuselage] [Engine] [Instruments] [Finish] [Credits]

Ted Van Over
Austin, TX
tedvo@flash.net